Horseshoe Draw Flood and Erosion Control Water Quality Improvement and Water Recharge Project
Horseshoe Draw where Phase 1 detention basin was built.   This is about three miles upstream from the San Pedro River. Photo by Darling Geomatics 

This project is a Hereford NRCD project made possible by an 
Arizona Department Environmental Quality Water Quality Improvement Grant,
Howard G. Buffett Foundation Grant, and Ladd Ranch contributions.

PROJECT HISTORY WITH PHOTOS
June 26, 2017  JOB IS COMPLETE
Photo by Mary Darling, Darling Geomatics
PHOTO  BY JOHN LADD, July 14, 2017
PHOTO BY John Ladd, June 26, 2017
PHOTO BY John Ladd, July 3, 2017
Hereford NRCD Newsletters
1374.5 cubic yards of sediment were retained by the erosion control structures in 2017

Horseshoe Draw Watershed Monitoring Plan Results – September 2017